mscLab Collaborated Grants [RM 1,727,730.00]
2007
[01] FRG0026-TK-1/2006, Vision-Based Sign Language Translator for The Hearing-Impaired Person, RM 60,000.00, January 2007 – January 2010 (completed). [Farrah Wong Hock Tze].
[02] FRG0110-TK-1/2007, Investigation on The Dynamic of Computation of Semi Autonomous Evolutionary Computation for Syntactic Optimization of a Set of Programming Codes, RM 70,000.00, October 2007 – April 2010 (completed). [Mohd. Sigit Arifianto].
2010
[03] FRG0212-TK-1/2010, An Exploratory Investigation into Behavioral Theory Approach for Based Fault Tolerant Control System Analysis and Design, RM 40,000.00, February 2010 – February 2012 (completed) [Yang Soo Siang].
[04] FRG0217-TK-1/2010, Mathematical Modelling and Simulation of Protein Denaturation during Heat Treatment of Daily Fluids, RM 40,000.00, June 2010 – November 2012 (completed) [Tham Heng Jin].
[05] FRG0222-TK-1/2010, Autonomous Underwater Vehicle Maneuverability Studies, RM 48,000.00, April 2010 – April 2012 (completed) [Yoong Hou Pin].
[06] FRG0248-TK-2/2010, Nano-Ballistic Saturation Velocity Modelling to Enhance Circuit Performances of Nano-MOSFET, RM 39,000.00, October 2010 – September 2012 (completed) [Ismail Saad].
2011
[07] ERG0002-TK-1/2011, Emerging Nanoelectronics Device Design Exploration Incorporating Vertical Impact-Ionization MOSFET and Strained (SiGe) Technology, RM 103,000.00, August 2011 – July 2013 (completed) [Ismail Saad].
[08] ERG0014-TK-1/2011, Concentrated Solar Powered Thermoelectric Refrigeration System for Sustainable Rural Development, RM 93,200.00, January 2012 – December 2014 (completed) [Yang Soo Siang].
[09] SLB0042-TK-1/2011, Design and Simulation of Top-Contact Structure Organic Thin-Film Transistor (OTFT) for Nanoelectronics Application, RM 8,000.00, February 2012 – January 2014 (completed) [Khairul Anuar Bin Mohamad].
2012
[10] FRG0310-TK-1/2012, Feasibility study for Off shore hydrogen harvesting system via photovoltaic using seawater, RM 75,030.00, May 2012 – May 2015 (completed) [Yoong Hou Pin].
[11] FRG0307-TK-1/2012, Modeling of Enhanced Ultraviolet (UV) Band Detector using Electrostatic Field Effect (ESF), RM 51,000.00, July 2012 – June 2014 (completed) [Bablu Kumar Ghosh].
[12] MTUN-COE C025/UTHM, Islanded Power System – Microgrids, RM 69,000.00, July 2012 – June 2014 (completed). [Goh Hui Hwang].
[13] RAG0023-TK-1/2012, Integration of Tolerance Theory with Optical Optimization in A Concentrated Photovoltaic (CPV) Modules, RM 70,000.00, December 2012 – November 2014 (completed). [Goh Hui Hwang].
2013
[15] FRG0353-TK-2/2013, Fast-Switching Vertical Strained Impact-Ionization Transistor for Ultra-Sensitive Based Biosensors, RM 145,000.00, January 2014 – December 2015 (completed). [Ismail Saad].
[14] FRG0350-TK-2/2013, Three Dimensional Virtual Modelling and Simulation of Reinforced Concrete Beams and Slabs Subjected to Impact Loads, RM 96,500.00, December 2013 – November 2016 (progressing). [Nittala Surya Venkata Kameswara Rao].
[16] FRG1417-TK-2/2013, Green-Y Model for preliminary Sustainable Economical Concept of Renewable Energy Sources Deployment in ASEAN countries, RM 96,000.00, September 2013 – August 2015 (completed). [Goh Hui Hwang].
2014
[17] RACE0009-TK-2013, Intelligent Sensory Modeling of Osmotically Dehydrated Pumpkin, RM 50,000.00, February 2014 – February 2016 (progressing). [Tham Heng Jin].
[18] RACE0010-TK-2013, Formulating A Robust Accuracy Measure for Tomographic Brain Imaging, RM 50,000.00, February 2014 – February 2016 (progressing). [Renee Chin Ka Yin].
[19] SF0106/2014, An Evolutionary Dynamic Equivalent Representation Development for Wide-Area External Power Systems, RM 237,000.00, April 2014 – April 2016 (progressing). [Goh Hui Hwang].
2015
[20] FRG1521-TK-1/2015, Economic Evolution Novelty of Increasing Electric Grid Resilience Through Micro Grid To Flood Attack, RM 73,500.00, April 2015 – December 2015 (progressing). [Goh Hui Hwang].
[21] SGI0026, Portable Capturing System for Nystagmus, RM 20,000.00, October 2015 – September 2016 (progressing). [Maher Fouad Sefein].
[22] FRG0425-TK-1/2015, Unstructured Electrical Impedance Tomography Using Ad Hoc Sensor Nodes, RM 73,700.00, November 2015 – November 2017 (progressing). [Renee Chin Ka Yin].
[23] FRG-TK-1/2015, Advancing the Alleviation of Energy Poverty and Biomass Prospect in South East Asia, RM 119,800.00, November 2015 – October 2018 (progressing). [Goh Hui Hwang].